SWIMMING POOL

The refurbishment of the municipal swimming pool forms part of a wider regeneration programme initiated in 2017, when the local council set out to transform the entire area into a multi-sports complex, beginning with the construction of the municipal Sports Hall.

Since childhood, the swimming pool had been a familiar place to me, one that would later inspire the design of the Sports Hall through its use of materials, spatial perception and relationship with the surrounding community. I conceived the two buildings as luminous lanterns, recognisable landmarks and points of reference for the town.

The refurbishment originated from the council's ambition to transform the existing swimming pool into a more spa-like environment, expanding its range of activities and making it accessible throughout the year.

The original eight-lane pool was reorganised to accommodate a six-lane swimming area, a medium-depth pool (1.20 m) for complementary activities and a shallow pool (0.60 m) for infants and young children. This transformation was accompanied by a comprehensive replacement of the existing building services and pool finishes, with the intention of improving both the functionality and the overall experience of the facility.

My architectural ambition was to create a distinctive spatial experience through the treatment of surfaces and the interplay between materiality and natural light.

The project explores this relationship through the reflections, tones and subtle variations produced by the dialogue between the polycarbonate envelope, the surrounding greenery and the interior surfaces.

These qualities shift throughout the seasons and as daylight changes from dawn to dusk, giving the architecture an ever-changing character. Externally, the lower part of the building was clad in white corrugated metal sheeting, while the existing 40 mm transparent polycarbonate façades were replaced with 60 mm opal polycarbonate panels.

Inside, the original red-painted steel beams were sandblasted and repainted white, allowing the structure to acquire a lighter and more restrained presence. The pool surrounds and changing rooms were finished with sand-coloured tiles, while the walls were clad in pale aqua-green tiles.

Colour became an essential architectural tool, carefully considered to establish a relationship between the interior, the surrounding landscape and the changing qualities of natural light.

The internal layout is organised around separate male and female changing rooms, each with its own facilities, and the main swimming area. The lower volume accommodates the plant rooms and storage spaces. Through this restrained material palette and the careful orchestration of natural light, I sought to transform an existing sports facility into a place where architecture, landscape and everyday activities become part of a shared spatial experience.